AQ-CRED-001

Maps the four AQ-NODE-G0 credibility bands onto gates AQ-GATE-04 through AQ-GATE-08, names the evidence that opens each gate and the public position permitted in each band, and fixes the rule that evidence unlocks a level while elapsed time never does.

Charter artifact · gated by Part 26 · revision 0, draft for internal review

AQ-CRED-001 — Twelve-month credibility timeline and gate mapping

PURPOSE AND STANDING

This document maps the four credibility bands defined in AQ-NODE-G0 onto programme gates AQ-GATE-04 through AQ-GATE-08, names the evidence that opens each gate, and fixes the public position permitted while a band is current. It constrains what the Akasha-Q programme may state during its first twelve funded months. It places no constraint on what may be designed or built in that period: the full reach ladder — optical bench, metro fibre and free-space, 20–30 km HAPS relay, CubeSat, operational LEO satellite, constellation — remains the programme's stated intent throughout, and the first-band restriction on claims is not a restriction on architecture.

At the time of writing nothing has been built and no element has reached laboratory validation. Every row below describes an intended design or a defined process. Present evidence level across L0–L9 is Concept, with Theory in preparation. The programme is funded from EduRankAI revenue and disciplined reinvestment; external capital, partnership and collaboration change the rate at which the bands below are traversed and never the evidence required to leave one.

THE ADVANCEMENT RULE

RULE AQ-CRED-R1

Evidence unlocks a level. Elapsed time never does. No gate opens on a calendar date. A gate opens when its named artefacts exist, are recorded in the Evidence & Provenance Fabric (L6), and survive review against DC-1 (every value tagged MEASURED / DERIVED / MODELLED) and DC-5 (the transition is reconstructable from the Fabric alone). Bands describe where the programme is expected to be; a band carries no authority to advance a claim.

MONTH-11 AT DM-2

A programme sitting at DM-2 in month 11 is in an accurate state, not a failing one. The failing state is a programme holding DM-2 evidence while making a DM-4 statement. Under DC-2 the absence of an artefact is itself a value: an unmet gate is recorded as undetermined with the missing artefact named, never as "on track" and never as a benign default.

BAND AND GATE MAP

BandNominal monthsExit gateHighest evidence level admissibleDemonstration ceiling
Band A — Recorded design0–3AQ-GATE-04Concept → TheoryDM-0 to DM-1
Band B — Modelled behaviour3–6AQ-GATE-05SimulationDM-2
Band C — Instrumented bench6–10AQ-GATE-06, then AQ-GATE-07Lab validation (named quantity only)DM-3, then DM-4
Band D — Witnessed repetition10–12AQ-GATE-08Lab validation, repeated and observedDM-5

DM-6 is not reachable inside twelve months under any evidence path, because it requires a capability repeatable outside the programme's own bench and operators. Field validation, Dynamic platform, Flight/space and Operational demonstration are levels of the Part 12 ladder that no gate in this document can confer.

WHAT UNLOCKS EACH GATE

  • AQ-GATE-04 — design record admitted. L0–L9 layer definitions written as testable statements; DC-1 to DC-5 expressed so that each has a falsifying observation; trust boundaries TB-1 to TB-5 drawn on the AQ-NODE-01 block diagram with the TB-4 hardware gate identified as a physical part; conflicts CF-1..CF-7, failure modes F-1..F-14 and decision boundaries B-1..B-5 registered with a named owner and a current state. Opens: publication of architecture.
  • AQ-GATE-05 — model admitted. An executable model of AQ-TSE-01 covering NORMAL, RESTRICTED, CRITICAL, DENY and RECOVERING; DC-4 shown against a fault-injection set derived from F-1..F-14, with trust falling on a single observation and rising only through the full recovery sequence; command authority evaluated so that Q1–Q3 act as hard constraints and Q4 is shown, over the whole run set, only ever to reduce what Q1–Q3 allowed; abstain and safe-hold demonstrated as reachable outcomes rather than declared ones. Opens: statements about simulated behaviour under a named assumption set.
  • AQ-GATE-06 — bench instrumentation admitted. L1 sensing and entropy acquisition running on real hardware inside TB-2 with deterministic timestamping; an uncertainty budget written and filed before the first measurement run; every published quantity carrying its DC-1 tag. Opens: statements about one measured quantity on one bench.
  • AQ-GATE-07 — reconstruction admitted. A reviewer with no access to the operators reconstructs each consequential transition from the Evidence Fabric alone (DC-5), including at least one deny and one abstain; the TB-4 hardware gate shown to hold against a commanded physical effect; the correction log open to that reviewer. Opens: statements about the trust chain, not only about instruments.
  • AQ-GATE-08 — witnessed repetition. The Band C procedure repeated on separate days by a second operator under external observation, with dispersion reported in the quantity's own units and the assumption set restated at each run. Opens: statements that a capability is repeatable on this bench.

Figure 1 — Calendar track (descriptive) against evidence track (authoritative)

 MONTH   0        3         6              10          12
         |--------|---------|--------------|-----------|
 BAND        A          B           C            D
         (calendar position is DESCRIPTIVE - it opens nothing)

 EVIDENCE TRACK  (the only track that opens a gate)

  [design record] --> GATE-04 --> ceiling DM-1
         |
         v
  [executable AQ-TSE-01 model] --> GATE-05 --> ceiling DM-2
         |
         v
  [instrumented bench, budget filed first] --> GATE-06 --> ceiling DM-3
         |
         v
  [independent reconstruction, DC-5] --> GATE-07 --> ceiling DM-4
         |
         v
  [second operator, separate day, observed] --> GATE-08 --> ceiling DM-5

  A band may expire with its gate shut.  A gate may open early.
  Neither event is an error.  Only a claim above the open gate is.

PUBLIC POSITION PERMITTED BY BAND

BandMay be stated publiclyMay not be stated in this band
AThe architecture, the ten layers, the design commitments, the reach ladder as intent, and that nothing is validated.Any description of behaviour as observed, modelled or measured.
BBehaviour observed in simulation, always with the assumption set, the model version and the fault set named in the same sentence.Any hardware statement; any statement that a property holds outside the model's assumptions.
CA named quantity measured on a named bench with its uncertainty and DC-1 tag; the reconstruction exercise and its findings.Generalisation from bench to link, platform, or any reach rung above rung 1; any timing or ranging figure without its uncertainty.
DThat the procedure was repeated by a second operator on a stated date under a named observer, with dispersion reported.Field validation, dynamic platform, flight or operational language of any kind.
PROHIBITED IN EVERY BAND

Unhackable. Impossible to intercept. Universally quantum-secure. Information-theoretically secure at system level. Satellite-ready. Space-proven. Operational. No geopolitical, sovereign-capability or defence framing in any band, at any evidence level, in any forum. Visvambhara is a separate aerospace programme and the first platform designed to carry an Akasha-Q terminal; it is never described as the purpose of Akasha-Q, and the shared record between the two programmes remains restricted-access. Deny

RECORD AND REVIEW

Each gate decision is written to the Evidence Fabric as a single entry: gate identifier, artefacts presented with their Fabric ids, reviewer, outcome from the permitted set (execute, execute-restricted, safe-hold, abstain, deny), and the specific artefact whose absence produced an abstain. Gate review may return abstain — insufficient confidence to authorize — and that outcome is filed, published to the claim register, and carries no penalty. L8 analysis may summarise a gate pack but never issues the outcome; a named human does. Bands are re-baselined at each gate opening, so a gate opened in month 4 does not compress the remaining bands and a gate unopened in month 12 rolls forward with its missing artefact still named.